IBM提供练习题(四)待续
ClearQuest® Integration
The purpose of this Laboratory is to review the materials covered in Module 13. By answering these questions, you will be reminded of some of the key points about integrating Rational® ClearQuest® with:
• Rational® Unified Change Management (UCM)
• Rational® ClearCase® (CC)
• Rational® Visual Source Safe (VSS)
实验的目的是复习第十三个模块。通过回答这些问题,你将加强对CQ集成中关键点的记忆。
Objectives
By answering the review questions in this exercise, you will:
Identify the steps required to configure UCM/CQ, CC/CQ, and VSS/CQ.
确定配置UCM/CQ, CC/CQ, and VSS/CQ必须的步骤
Describe the basic functionality of the UCM/CQ, CC/CQ, and VSS/CQ.
描述UCM/CQ, CC/CQ, and VSS/CQ的基础功能
Exercise 13.1: Answer the following questions:练习13.1 回答下面问题
1. In the UCM/CQ integration, which level of UCM objects must be ClearQuest-enabled?
在UCM与CQ的集成中,哪些UCM对象将必须被CQ激活。
2. True or False: You can use both the UCM/CQ integration and the CC/CQ integration in the same project.
真或假:在同一个项目中你能同时用UCM与CQ的集戌及CC与CQ的集成吗?
3. True or False: In the CC/CQ integration, the request sets are implemented in CC as a set of hyperlinks attached to a version.
真或假:在CC与CQ的集成中,请求的实现是通过一个超链接与一个CQ版本联系的
4. In order to implement the UCM/CQ integration for change management, which versions of ClearCase and ClearQuest are required?
CC与CQ哪个版本支持UCM与CQ集成的变更管理
5. True or False: You can have one ClearQuest schema run both the CC/CQ integration and the VSS/CQ integration at the same time.
真或假:你能有一个CQ的模式同时运行在CC与CQ的集成及VSS与CQ的集成上吗?
6. True or False: You cannot use the Rational Synchronizer to synchronize change request records in Rational ClearQuest and requirement specifications in Rational RequisitePro.
真或假:你不能用Rational Synchronizer使CQ中的记录需求变更与需求管理RequisitePro.中的变更同步。
7. What is the difference between Update and Synchronize in Rational ClearQuest Project Tracker?
Rational ClearQuest项目跟踪系统的更新与同步有哪些不同?
Answers for Exercise 13.1:练习13.1的答案
1. Project. 项目
2. False. At the project level, you can only select either UCM/CQ or CC/CQ, but not both.
假:在项目层你仅能选择UCM与CQ或者CC与CQ集成中的一个
3. True. 真
4. Starting from ClearCase Version 4.0 and ClearQuest Version 2.0, UCM/CQ integration is supported.
ClearCase Version 4.0 and ClearQuest Version 2.0支持UCM与CQ集成
5. False. Any single ClearQuest schema can have either the CC/CQ integration or the VSS/CQ integration, but never both.
假:一个CQ模式只有在CC与CQ集成或者VSS与CQ集成中一个环境中运行
6. True 真
7. Update is a one-way transfer of data from ClearQuest to Microsoft Project 2000. Synchronize is a two-way transfer of information, with updates flowing first from the ClearQuest database to the project plan and then from the project plan back to the ClarQuest database.更新是将数据从CQ移动到Microsoft Project 2000。同步是允许CQ数据到项目计划,数据再从项目计划到CQ。